Christopher R. Wik 33 Fence Creek Drive • Madison, CT 06443 Wikster411@gmail.com • Cell 203.909.1074 Project
Control Specialist/Planner/Master Scheduler Heavy
Industrial, Power, Energy, University, State & Federal Infrastructure
Projects • A seasoned professional (15 years) with management
supporting experience and in all aspects of project life cycle from
conceptual development, indicative pricing, permitting, engineering,
procurement, construction, pre-commission, commissioning, startup, tuning,
and project closeout utilizing Earned Value Management techniques and
processes. Established strong technical and project leadership for a variety
of professional service engagements and technical projects, but not limited
to achievements in driving changes, process improvements, and having a
significant improvement of safety, quality, and service levels for users,
applications, communication, and processes. My background demonstrates
expertise in the planning areas of Permitting, Engineering, Procurement,
Construction, Pre-commission & Startup. Core Competencies … üStrategic
Planning, Execution, & TrackingüSchedule
Comprehension & Analysis üComprehending
Contract DocumentsüDetailed
Organization/Value
Engineering
üBudget,
Projections, and Cost AnalysisüTeam
Collaboration & Leadership üP&ID,
Spec, Data, & Drawing Comprehension üTeam/Cross
Functional Team
Coordination
Key Construction Management Proficiencies … üProject
Management (Cost and Schedule)üSafety/Quality
Management
üProcurement
Management üRisk
Management
üAccounting/Financial
ManagementüOperation
Management
Education Wentworth
Institute of Technology • Boston,
MA •Bachelor
of Science Degree in Construction Management, Accredited
Degree •Associate’s
Degree in Building Construction Technology, Accredited Degree
Synopsis of Significant Experience
ü Extensive Communications Experience … Collaborate among project owner representative,
architect firms, engineering firms, manufacturing departments, GC,
subcontractors, building department, government/state/local/in-house
inspection agencies, Fire Dept., Power Company, telecommunications, ECC, NRG,
FERC, Regulatory Process, ACE, SHPO, USFWS, ROW (easement), Out Reach, Open
Houses, EMC, DNR, DOT, IPP, Power/Oil/Gas Plant Maintenance, Environmental
Studies, P-tech, Survey (Permits, ROW, cultural, biological, perimeter,
blue/red top), acquisitions, permits, suppliers, estimator,
procurement/logistics, supporting financial, plant maintenance, plant
operators, and field personnel disciplines. ü
Range of Experience includes the following (& many others not
listed but tailored to clients requirements) - Cost/Schedule/Risk Analysis Monthly
Reports - Resource Loading/Leveling/Discipline
Productivity
- Proposal/Template/Level 1-4 Project
Schedules - Quantities/Unit Rates/Estimates - Planned/Actual/Quantity/Cost-Loaded
Schedule - Planned look-ahead
Schedules/
Equipment Schedules - (IMS) Integration Master Schedules
- (WBS) Work Break-down
Structure -Requisition/Element Control/Estimates
- % Complete
Graphs/Trends/SPI/CPI
-(EVM) Earned Value Management
- Daily/Weekly/Monthly Status
Mtgs.
-Schedule Delay Impacts/Change
Orders
- Graph Curves containing early, late, target, & projected - (CPM) Critical Path Methods/Defining
Exhibits - Cash Flow/Comp Factor/Rates plus
Indirect/Direct -(ACWP) Actual Cost of Work
Performed
- Schedule Index Productivity /Control of
Production
- (WBS) Work Break-down Structure
- Negative/Positive Float, Various Finish
Reports
-Base-line
Schedule/Maintained/Revision/Backup - Risk/Opportunities/Recovery
Plan/Network Diagrams -MHr Burn Down &
S-curves, KPI milestones - Material
Coordination/Preparation/Issues
ü
Seasoned prospective and
retrospective schedule delay analysis experience
including the collection of data pertaining to project delay events,
assessment of affected schedules, and determination of appropriate
methodology of analysis. Methodologies utilized include time
impact, impacted baseline, as-planned v as-built, and windows. Time
impact delay analysis efforts included preparation of fragnets to represent
delay events and/or identification of delayed activities, analysis of impact
events upon the schedule, and preparation of delay claim reports.
Contributor/Volunteer/Donations ∙
Ronald McDonald Houses ∙ United Way ∙ National Breast Cancer Foundation ∙
National Inclusion Project∙ Salvation Army ∙ National Pancreatic Cancer
Foundation ∙
Wounded Warrior Project ∙ Support Our Troops ∙ Department of
Energy Environmental Protection ∙
Toys for Tots∙ American Heart Assoc.∙ Foundation for American Veterans
Christopher R. Wik
Page 2 PC
Software – (quick learner of
company’s software) ∙Primavera
P3 P5 & P6.0-8.4 ∙SAP/CRIS/BOM∙Prolog Manager∙Business Objects/Asset
Suite ∙Precision
Estimation∙MS Project Planner∙Tarantella∙Claims
Digger
∙Timberline
(estimating)∙Business Objects∙Sure-Trak∙Intranet/Internet/Share
Point
∙Timberline
(cost tracking)∙Expedition/PLM∙Project View∙Passport/Load
Spring
∙CMIS
and TICMS∙MS Suite 10/13∙ Crystal Reports∙Acrobat/PDF Creator History of Projects (EPC/PMC/OEM/EPM/Hard Bid/Cost Plus/Time &
Material contracts- plus Capital & O&M Projects) Range of Project Cost - $50 thousand up to $600
Million (multiple projects at a time) - Selected Catalyst Reduction
(Power Plants) - Fossil Fuel Rehab Boiler
- Minor Nuclear Experience -Food Processing
Plant
- Ethanol Plants (Biomass)
- Cold Storage/Winery Facility -Power Plants (combine cycle)
-
Medical/Laboratory
- Diesel Refinery (ISBL & OSBL) - Utilities/Site Improvements,
Roads - Building
Infrastructures
- Time-Shares/ Condominiums -Schools (high/colleges)
- Justice/Detention
Facility
- Railway/switching experience -Federal/State Penitentiary/City Hall
- Commercial Buildings
- Substations/Demolition -Bio Fuels Service
Stations
- UPS Specialty Facility
- Booster & Injection Pumps (Oil) -
Commissioning/Outage/Turn-around (TAR) - GE 7A-frame comb/cycle
- Coal Fire Power
Plants/Outages
-
Gas Plants/Compressor Stations/Pipelines
- Transmission T/D and T/T
- Waste Water facility Continuing Education Credentials Contributor Certificates
/ Certifications / Seminars / Awards ∙Certified
Primavera P6 (Simplex) ∙TWIC card holder ∙Project
Admin Training Primavera (PCI Group)∙Advance P-3 Training Primavera (PCI
Group)
∙Safety
Award (H & A)∙Red Cross CPR Training ∙Protect
Your Construction Site∙ACI Concrete Testing (Tech I) ∙Mgmt.
Construction Delays Primavera (PCI Group)∙Dust Monitor Certification (Las
Vegas) ∙Rapport
Leadership I (JFDI)∙Project Manager & Take Control Training
(AGC)
∙Rapport
Leadership II (JFDI)∙Contract Document & Law
(AGC)
∙OSHA
10-HR Health & Safety∙Construction Management Training (H &
A)
∙Best
Project Award under 75M (TIC)∙Safety Award under .04 Hr (TIC) Chronology of Professional Employment AEP
• Brilliant, OH … Utility
(Outage Fossil) Cardinal Power Plant
08/15-12/15 Westcon
(Bilfinger) • Bismarck, ND …
GC (Outage/TAR/Maint) Sinclair Refinery 04/15-08/15 Columbia
Pipeline Group • Charleston, WV
… Oil & Gas Company01/15-04/15 Hiland
Partners • Oklahoma City, OK …
Oil & Gas Transfer Company05/14-12/14 Westcon
(Bilfinger) • Bismarck, ND …
Industrial General Contractor & PMC firm09/13-04/14 Duke
Energy Progress • Raleigh, NC …
Power Utility Company
08/10-08/13 Over-lap
(part-time) Barton
Malow Company • Southfield,
MI … Power General Contractor & CM firm
01/10-02/12 Satellite
Scheduler Gemma
Power Systems LLC • Glastonbury,
CT … Power General Contractor09/09-12/09 Babcock
& Wilcox Power Generation (McDermott) • Barberton, OH Power Engineering05/08-06/09 Delta-T
Corporation (Bateman Litwin) • Williamsburg,
VA … Ethanol Engineering07/07-02/08 The
Industrial Company (TIC) •
Steamboat Springs, CO. Industrial General Contractor10/05-06/07 Construction
Development Services, LLC • New
Haven, CT … Private Developer01/05-09/05 Harris
& Associates • Las Vegas, NV … CM
& Engineering03/03-09/04 Carson
Taylor Harvey • Las Vegas, NV … General
Contractor ------------01/01-10/02 Target
General of NV, Inc. • Las Vegas, NV
… General Contractor ------- Same team01/00-12/00 Clark
& Sullivan Constructors • Las
Vegas, NV … General Contractor - 01/98-11/99 Christopher R. Wik
Page 3 History
Synopsis (Position/Project/Responsibility)
AEP – Multiple
Outage Projects ü Federal Contract Outage/Maintenance Generation
Planner Scheduler... Coal Fire
Power Plant Outage Project –
Typical 18 month shut-down & Startup Boiler Outage, removal/replace 1500 super
heat tubes in conjunction turbine tear down/rebuild of bearing replacement
including 755+ work orders relating to capital/maintenance projects – AEP ∙
Scheduled & Baseline a 65 day power plant outage within 1 month time
period; which developed into a dual outage. Developed template
shut-down/startup schedule, 65 day outage baseline schedule plus emergent
work schedules for unit 1, assembled 2nd maintenance outage
schedule for unit 2, burn down man-hour curves for multiple disciple &
organizations, SPI, various percent complete, critical path, multiple
secondary critical float paths, work break down structure, milestones,
schedule analysis regarding health, custom daily reports, establish updating
meetings and various look-ahead schedules on daily basis. Project had
additional scope due to discovery, but the baseline Critical Path finish 1
week ahead of schedule. Team members consist of operations, plant,
maintenance contractors, outside contractors, and regional in house
personnel. This was the 1 of 2 regional outage of AEP that finished within
the time frame in 2015, without first aid or recordable for primary critical
path work. Westcon Industries (Bilfinger) – Projects ü
Contract Outage/Capital Work
Scheduler... Oil/Hydrogen/Steam/Gas
Refinery/Asphalt/Acid/OSBL TAR/Outage Projects – Boiler Outages, GRU Outages, Alky Outages,
Hydrogen Heater Outage, OSBL Tank Projects, Civil Foundation Projects –
Sinclair Refinery ∙
Scheduled General Oil, Gas, Hydrogen, Cocker, Asphalt outage in vast
magnitude disciple work for Refinery amongst multiple contractors, suppliers,
work orders, work permits, procurement, operations, and equipment. Maintained
schedule thru startup and updated resource curves, EVMS, and percentage
complete. Columbia Pipeline Group – Project ü
Contract IMS Project
Planner/Scheduler... WB XPress
Gas Project (mid-stream) -
consisting of: Gas Pipeline Transmission, 2 Gas Compressor Stations, Station
Modifications, Pre-fab Buildings, Tanks, and Tie-ins ($800M) for Nisource ∙
Brought schedule up to date, imputed subcontractors schedules, worked with
outside agencies and contractors on relationships, established critical path,
analyzed schedule and notified PM of findings, created air permit and power
company obtainment schedule sections, added/re-built procurement schedule,
distributed variance reports and look-ahead schedules, and monitor
progress. Hiland Partners (Integrated Consulting Group) – Project ü
Contract Owner Rep. Project
Planner/Scheduler... Oil &
Gas Transfer Projects (mid-stream)
- consisting of: Gas Plant, Gas Plant Expansion, Gas Compressor Station,
Booster Stations, Injection Stations, Pre-fab Buildings, Pipelines, Tanks,
and Tie-ins (ranging from $800K to $70M) for Hiland Partners ∙
Consulted and implemented project control scheduling methods. Applied gate
system scheduling mythology with steps for small maintenance type projects
and develop detailed engineering, procurement, construction,
pre-commissioning, and commissioning activity schedules for larger capital scale
projects. Maintained plus or minus 15 projects, both in schedule and in
physical percent complete. Held planning meetings, established baseline, CPM,
developed weekly and overall variance reports. Built early, late, targeted,
and actual percent complete graphs for disciplines and overall progress.
Graphs also include weekly burn down percentage. Provided monitoring
and analysis to PMs and other supporting groups. Basic and custom
reports were developed, based on viewer preference. Helped cost department
with graphs. Project visit auditing of schedule and provide field personnel
with social morale. Westcon Industries (Bilfinger) – Project ü
Contract Owner Rep. Master Project
Planner/Scheduler... Dakota
Prairie Diesel Refinery – 20,000
Barrels per-day Diesel Refinery Project - 24 month duration ($400M)
for MDU & Calumet ∙
Refinery Project consisted Crude Distillation (towers & heaters),
Distillate Hydrotreater (DHT reactor) Amine Regeneration, Sulphur Recovery,
Hydrogen Generation, Naphtha Stabilizer, Sour Water Stripper, Utilities,
ISBL, OSBL, Flare, control/lab/maintenance/utility/administration building,
load/unloading area, LACT, power distribution/substation, PDCs, pipe racks,
tanks, 10 miles of offsite Industrial water, 5 miles of offsite sanitary
sewer, offsite lift station, offsite potable water, and combine projects with
True Oil and Bakken Oil Express. ∙
Re-establish WBS, relationships, importing multiple engineering and
construction schedules, built and maintained procurement schedule, re-built
construction schedule to a level 4 schedule, built pre-commissioning
schedule, established Critical Paths, re-baseline, developed weekly and
overall variance reports, assigned resources, built various graphs, and
monitoring of progress. Held review meetings and worked with
individuals to improve resource allocation and time. Advise director of
potential trouble areas through analysis and weekly reports. Weekly
reports were custom created to fit the needs of the project. Duke Energy Progress – Projects Contract
Senior Project Control /Planner/Scheduler... Transmission Projects – 35+ projects in various stages. Christopher R.
Wik
Page 4 ∙ Program interface
Schedule and cost coordination of resource and hour data entry from,
engineering study, environmental engineering, conceptual engineering, design
engineering, right-of-way, easements, permits, detail engineering, supply
chain/material, coordination with power plants and ECC for clearance/outage
dates, inspectors, internal discipline crews, maintenance personnel, and
subcontractor for Western North Carolina and South Carolina Transmission
regions. Prepare long term and short term plans Schedule and cost
update including cash flow, WBS structure, reviewing invoices, trend
forecasting, network diagrams, S – curves, KPI milestone, Earn Value Methods,
EPPR, and Critical Path Methods. Built one page plan for each region in
construction in conjunction with engineer completion dates to simplified
overall projects for PM & construction supervisors. Improve on
communication amongst team members, cost projects, and planning during my
contract duration. ü
Contract Senior Project Control
/Planner/Scheduler/Estimator... LiDAR
Projects – 340 Main Lines
(including tap and feeder) projects - ($80M project for O&M
and Capital) for Duke Progress Energy Carolinas ∙
Schedule and cost coordination fly data, engineering study, engineering,
supply chain/material, clearance, inspectors, internal discipline crews,
outages, and subcontractor. Schedule and cost update including Earn
Value Methods and Critical Path Methods. Work scope involved permits,
environmental studies, easements, right-of-ways plus Power Plants (nuclear,
coal, gas/oil, and hydro. ü
Contract Senior Project Control
Construction/Planner/Scheduler of Resources... All Transmissions Projects – 530+ active and planned projects for 2012 plus
beyond - ($120-180M yearly) for Progress Energy – Carolinas
∙ Transmission Projects consisting: TT, TD, Switchyards, & Substations
ranging from 64kW to 500kW. ∙
Establish complete tracking schedule and methods consisting of baselines,
layouts for various audiences, and resource leveling with managers and
supervisor for construction disciplines & those belonging to maintenance.
∙
Established reports and communication between Supply Chain and Construction
Work Management for outsourcing subcontractors. Reviewing schedules for
potential construction impacts, from un-bid work. ∙
Development of construction installation rates for future project estimating
and man-hour curves for resource availability, and for scoping team. ∙
Consolidate information into manageable effective reports for program
managers to manager workloads and held review meetings. ü
Contract Senior Project Cost
Analysis/Planner/Scheduler... Sutton
Power Plant – 18 Transmission
Projects - 36 month duration ($22M) for Progress Energy ∙ Transmission
Projects consisted of TT’s, TD’s, & Substations @ 115kW and 230kW. ∙
Establish remaining level 3 schedule, baseline, level 2 network diagrams,
resources, graphs, cost tracking techniques, and monitoring of
progress. Held review meetings. Cost projection for the year was
less than 1.5% which consisted of 37% of department’s budget (overall cost
projection for the department was 7%). Designed and established special
reports for myself which colleagues and managers began implementing into job
manual. ü
Contract Senior Project Cost
Analysis/Planner... Wayne County
– 37 Transmission Projects - 48
month duration ($54M) for Progress Energy ∙ 37
combined Transmission Projects consisting TT’s, TD’s, & Substations @
115kW and 230kW. ∙
Establish graphs, cost tracking techniques, and support where needed. Baton Malow Company – Projects ü
Satellite Contract Project
Scheduling Manager... Howard M.
Down Generating Station Power Plant
Project (Unit 11) - 14 month duration (Hard Bid; $23M) for Vineland Municipal
Utilities, NJ. ∙
Project electrical output of 64 MW Simple Cycle consisting of; 1 Rolls Royse
Trent 60 combustion gas turbine generators (CTGs) equipped with a selective
catalytic reduction system. ∙
Establish base-line schedule, critical path(s) analysis, variance reports,
trend reports, maintained progress updates, and analysis. Project is
ongoing at this time and takes up 1-2 hrs. a week with an occasional job
visits. ü
Satellite Contract Project Proposal
Scheduler... Power Plant
Projects – 12-36 month durations
(Hard Bid & EPC; $22-$200M) ∙
Establish Proposal schedules, resource loading, material quantity loading,
created quantity graphs, man power graphs, critical path(s) analysis, &
quantity take-offs. Perform upon request by Barton Malow Company. ü
Contract Project Controls/Scheduling
Manager... Middletown
Re-powering Power Plant Project -
12 month duration (Hard Bid; $200M) for UI & NRG (NOT THE ONE WHICH HAD
EXPLODED) ∙
Project electrical output of 200 MW consisting of; four General Electric (GE)
LM6000PC Sprint Systems combustion gas turbine generators (CTGs) equipped
with a selective catalytic reduction system. ∙ Establish base-line
schedule, resource loading, material quantity loading, created quantity
graphs, man power graphs, critical path(s) analysis, quantity take-offs,
variance reports, trend reports, budget forecasts, earn value cost/schedule,
maintained progress updates, and analysis until NRG shut down the job. Christopher R.
Wik
Page 5 ü
ü
Contract Project Planner/Scheduler
... Devon Re-powering Power
Plant Project - 12 month duration
(Hard Bid; $200M) for UI & NRG ∙
Project electrical output of 200 MW consisting of; four General Electric (GE)
LM6000PC Sprint Systems combustion gas turbine generators (CTGs) equipped
with a selective catalytic reduction system. ∙ Rebuilt schedule,
establish base-line schedule, critical paths, variance reports, maintained
progress updates, and
analysis through construction, pre-commission, and into start stages.
Project initially was 3 1/2 months late with 5 months
remaining when I joined the team. Together
we diminished 3 1/2 months to 1/2 month during the 5 month
period. Gemma Power Systems LLC – Project ü Project Controls/Scheduling Manager... Colusa Generating Station (CGS) Power Plant Project - 24 month duration (EPC; $316M) for
PG&E ∙ Project electrical
output of 660 MW consisting of; two General Electric (GE) Power Systems Frame
7FA combustion gas turbine generators (CTGs) equipped with dry low NOx
combustors designed for natural gas, two multi-pressure heat recovery steam
generators (HRSGs) with duct burners and a selective catalytic reduction
system (to be used with aqueous ammonia), one steam turbine-generator (STG)
system with multi-cell air cooled condenser: and associated auxiliary system
and equipment (i.e., lubrication oil system including oil coolers and filters,
and generator coolers), a 1000 kW standby diesel generator for extended
utility outages during maintenance and shutdowns. The project employ a zero-liquid discharge
system where the water from the combustion turbine generator's evaporative
coolers is recovered for reuse in the plant and the remaining salts are
concentrated for disposal off site. ∙
Re-establish and improve project control mechanism, schedule, and client
relations during pinnacle point of the project. Babcock & Wilcox Power Generation – Projects ü
Contracted Scheduler/Project
Controls... Campbell Unit 2 SCR Project - 34 month duration (EPC) for Consumer
Energy Company ∙ A past shelf
project with structural steel onsite. Coordinated and developed remaining
engineering/procurement schedule while working on other proposal schedules
and four other projects. Daily activities consisted of imputing change
order activities, cost codes, resource creation/update, graphs, man loading,
earned values, logs, graphs, reports, meetings, and various analyses.
Establish base-line schedule with engineering department, subcontractors,
construction, and other entities. ü
Contracted Proposal Scheduler… East Kentucky SCR Unit 3 Project – 20 month duration (Hard Bid) ∙
Developed engineering/procurement proposal schedule while creating and
updating four other project schedules. ü
Contracted Scheduler/Project
Controls… Powerton Unit 5 &
6 (quad) SCR Project – 49 month
duration (EPC; $250M) for Midwest Generation ∙
Established engineering/procurement baseline schedule w/resources, earn
values, 4,500 plus activities, ties to construction and CM schedule, unbroken
weekly updates. This is one of five projects which I was working on
during my contract obligations with company. Project became suspended 12-15
months due to recession. ü
Contracted Proposal Scheduler… Davis Besse Nuclear Boiler Retrofit Project – 72 month duration (EPC) ∙
Developed engineering/procurement proposal schedule while creating and
updating five other project schedules. ü
Contracted Proposal Scheduler… Edge Water & Lafarge SCR Projects – 30 month duration (EPC) ∙
Developed these engineering/procurement proposal schedule while creating and
updating five other project schedules. ü
Contracted Scheduler/Project
Controls… Sandow Unit 4 SCR Project – 42 month duration (EPC; $50M) for KKR ∙
Sustained residual schedule w/ append prolong changes through beginning
procurement and final stages. Daily activities consisted of imputing change order
activities, cost codes, resource creation/update, graphs, man loading, earned
values, logs, graphs, reports, meetings, and various analyses. Working with
engineers and others to establish baselines and working schedule updates.
This is one of four projects I was assigned to during my contract assignment.
ü
Contracted Scheduler/Project
Controls… Crystal River Unit 4
SCR & 5 SCR Project – 48 month
duration (EPC; $100M) for Progress Energy ∙
Sustained residual schedule with steady append prolong changes through
procurement and final stages. Daily activities consisted of imputing
change order activities, cost codes, resource creation/update, graphs, man
loading, earned values, logs, graphs, reports, meetings, and various
analyses. Working with engineers and others to establish baselines and
working schedule updates. This is one of four projects I was assigned to
during my contract assignment. Contracted
Scheduler/Project Controls… recommence
Oak Grove Boiler Plant Project 42 month duration (TM; $100M) for KKR
Christopher R.
Wik
Page 6 ∙
Sustained residual schedule combine with modification foot prints through
final stages. This is one of four projects I was assigned to during my
contract assignment. Daily activities consisting of change order activities,
cost codes, resource creation/update, graphs, man loading, earned values,
logs, graphs, reports, meetings, and various analyses. Working
with engineers and others to establish baselines and working schedule
updates. Engineering and equipment finish on-time and within budget. Delta-T
Corporation – Projects ü
Contracted Project Controls/Master
Scheduler … Ethanol Plant Projects - 3-24 month durations (EPC; $20M-$180M) ∙ Created a master
schedule plus template schedules for more than 40 ongoing projects globally
(achieving staff loading and forecast goals) and scheduling of internal
detailing for multi-phased package projects plus templates (i.e., PFDs and P&IDs)
as well as creating/analysis/updating new and existing EPC ethanol project
schedules. The
Industrial Company – Projects ü
Project Controls/Scheduler … 110 MGPY Ethanol Plant, Railway, & Waste Water
Facility Project – 24 month
duration (EPC; $140M) for BioFuel Energy Corp.
∙ Updating schedule, discipline productivity, LEI, quantities, estimates,
man-hours loading, codes, change orders, tap-card checking, cost control,
progress meetings, holding scheduling meetings, back-charge logs, equipment schedules,
direct and indirect schedules, monthly reports, cost analysis, project
forecast projections, monthly billing, schedule of values, weekly quantity
reporting, monthly photos, cost curves, coordinating master schedule with
other firms and field personnel. ü
Project Controls/Scheduler … 108 MGPY Ethanol Plant with Expansion 216 MGPY,
Railway, & Waste Water Facility Project
– 24 month duration (EPC; $240M) for American Ethanol ∙ Project was shut down
before final contract was signed. Construction and development package
had occurred through initial preliminary contract. Creating master
project schedule, developing cost code budget, quantities, estimates,
man-hours loading, equipment schedules, direct and indirect schedules,
monthly cost reports, project monthly forecast projections, working with
other firms and suppliers. ü
Project Controls/Master Scheduler … Ethanol Plant Project Development – 12-24 month durations (existing/future EPC) for
The Industrial Company ∙
Performed modifications, updating, and analysis to the master schedule for
future and presently ongoing ethanol projects in achieving staff loading and
forecast goals. Track actual cost, performed cost analysis,
projections, and forecasting reports to development and construction manager. ü
Project Controls/Scheduler …2 - LM6000 Power Plant – LUS South – 11 month durations (EPC; $50M) for Lafayette
Utility Systems ∙ I was brought on as
Project Controls/Scheduler to repair schedule flaws. I turned around the
operation by defining where we were in the project, determining what we
needed to perform, and establishing milestones to ensure successful
completion. I worked effectively with diverse disciplines, calculating
productivity performance to ensure on-time/under-budget results and tracking
on a weekly basis to properly adjust monthly project
forecast. Updating schedule, discipline productivity, LEI, quantities,
estimates, man-hours loading, codes, change orders, took part in Personal
Behavior System (safety program), safety committee leader, tap- card
checking, project critiques, cost control, cost analysis reports, progress
meetings, scheduling meetings, back-charge logs, equipment schedules, direct
and indirect schedules, graphs, monthly reports, project forecast projections
& misc. team support for disciplines. ü
Project Controls/Scheduler … 2 - LM6000 Power Plant - LUS North Project - 11 month duration (EPC; $50M) for
Lafayette Utility Systems ∙
Adjust monthly project forecasting, updating schedule, discipline
productivity, LEI, quantities, estimates, man-hours loading, codes, change
orders, cost analysis reports, Joint Venture billing certification,
back-charge logs, equipment schedules, direct and indirect schedules, monthly
reports, project critiques & misc. team support for disciplines,
warranties, and close-out. ü
Project Controls … 2 - LM6000 Power Plant Project - 11 month duration (EPC; $45M) for Leon
Creek Power Partners ∙ Adjust monthly project
forecasting, cost analysis reports, Joint Venture billing
certification, back-charge logs, monthly reports, project critiques &
misc. team support for disciplines, warranties, and close-out. Construction
Development Services, LLC – Projects Estimator/Scheduler
… ASB MEP Infrastructure Project - 14 month duration (Hard Bid; $15M)
for Yale School of Medicine Christopher R.
Wik
Page 7 ∙Established design
team foundation (Civil/Architect/Mechanical/Electrical/Plumbing/Structural),
created schematic design, acknowledge Traffic
Commission/Planning/Zoning/Fire/Bldg. departments, created conceptual
schedule, entered design phase, 70-85% drwg/spec performed construct ability
review, 85-95% drwg/spec created budget cost, value engineer, 100% drwg/specs
went to bid phase, construction schedule, bid invitation/bid form, pre-bid meeting/walk-through,
addendums, proposal check list, allowances, reviewed bids/contractors, built
GMP, awarded/wrote contracts, pre-construction meeting, built/reviewed
schedule of values, check insurances, reviewed certified pay roll, RFI's,
RFP's, reviewed submittals, close-out documents. ü
Project Manager/Estimator … Renovation
Project - 6 month duration (Hard Bid; $3M) for University of New Haven Established design team
foundation (Civil/Architect/Mechanical/Electrical/Plumbing/Structural),
created schematic design, acknowledge Traffic
Commission/Planning/Zoning/Fire/Bldg. departments, created conceptual
schedule, entered design phase, 70-85% drwg/spec performed construct ability
review, 85-95% drwg/spec created budget cost, value engineer, 100% drwg/specs
went to bid phase, construction schedule, bid invitation/bid form,
pre-bid meeting/walk-through, addendums, proposal check list, allowances,
reviewed bids/contractors, built GMP, awarded/wrote contracts,
pre-construction meeting, built/reviewed schedule of values, check
insurances, reviewed certified pay roll, RFI's, RFP's, reviewed submittals,
close-out documents. ü
Assistant Project Manager/Estimator
… Underground Utilities Project - 8 month duration (EPC; $6M) for Yale
School of Medicine ∙ Established design
team foundation (Civil/Architect/Mechanical/Electrical/Plumbing/Structural),
created schematic design, acknowledge Traffic
Commission/Planning/Zoning/Fire/Bldg. departments, created conceptual
schedule, entered design phase, 70-85% drwg/spec performed construct ability
review, 85-95% drwg/spec created budget cost, value engineer, 100% drwg/specs
went to bid phase, construction schedule, bid invitation/bid form, pre-bid
meeting/walk-through, addendums, proposal check list, allowances, reviewed
bids/contractors, built GMP, awarded/wrote contracts, pre-construction
meeting, built/reviewed schedule of values, check insurances, reviewed
certified pay roll, RFI's, RFP's, reviewed submittals, close-out documents. ü
Project Manager/Estimator … Transplant/Plastic Surgery/Oncology Tenant
Improvement Projects 2-3 month
durations (Hard Bid; $1.2M) for Yale School of Medicine ∙
Established design team foundation
(Civil/Architect/Mechanical/Electrical/Plumbing/Structural), created
schematic design, acknowledge Planning/Zoning/Fire/Bldg. departments, created
conceptual schedule, entered design phase, 70-85% drwg/spec performed
construct ability review, 85-95% drwg/spec created budget cost, value engineer, 100%
drwg/specs went to bid phase, construction schedule, bid invitation/bid form,
pre-bid meeting/walk-through, addendums, proposal check list, allowances,
reviewed bids/contractors, built GMP, awarded/wrote contracts,
pre-construction meeting, built/reviewed schedule of values, check
insurances, reviewed certified pay roll, RFI's, RFP's, reviewed submittals,
close-out documents. Harris & Associates – Projects ü
Office Engineer/QA Inspector/Owner’s
Representative … No. Las Vegas
Justice Facility Project - 12 month
duration (Hard Bid; $30M) for City of North Las Vegas - Harris &
Associates ∙ Conducted &
implemented all Building Department inspections, minus specialty and
governing inspection agencies. Deriving non-compliances, corrective
action, document sign-off of code compliance work, & detailed daily
reports in conjunction with as-built schedule which coincided with base-line
schedule. Other task functions were
foreseeing plan discrepancies, performing estimates but not limited to value
engineering, reviewing submittals, forecasting schedule projections, updating
and checking General Contractor’s record drawings. Maintained final
punch-list items closely monitored and noted down work corresponding to time
& material, not exceed, released change-orders, & potential unforeseen
claims. ü
Office Engineer/QA Inspector/Owner’s
Representative … Henderson City
Hall - 24 month duration (Hard Bid;
$40M) for City of Henderson ∙
Bestowed additional field and administration assistance. Engage in
developing a drawing log, Embark upon assembling a set of record
drawings. Refurbish current day-to-day as-built schedule in reference
to base-line schedule. Provided services in estimating,
contributed to QA control. Hammered out, a thorough punch-list.
Performed various inspections and composed reports along with daily
journals. Established an assessment of
direct cost savings derived from Harris & Associates Building
Construction Review & the RFI’s, CO’s, & ASI’s that had acquired
during the construction phase. Carson Taylor Harvey - Projects Project
Engineer … Curriculum &
Professional Center Project - 3
month duration (Hard Bid; $3M) for Clark County Christopher R.
Wik
Page 8 ∙
Worked this project from start to successful completion, establishing
schedules, doing takeoffs, retaining subcontractors, and managing schedules
to avoid overtime (saving money) while aggressively scheduling work to avoid
downtime/lost time. ü
Project Engineer … UPS South Phase I,II, III addition/renovation Project – 15 month duration
(Hard Bid; $8M) for UPS ∙ Creating working
schedule (550 plus activities), up dating schedule, submittal review and
coordination, checking for contract document discrepancies, submitting
revisions to Building Department, & clearing non-compliances. ü
Project Engineer … 78 Upscale Timeshare Complex Project – 12 month duration (Hard Bid; $10M) for
Club De Soleil ∙ Handled completion recovery for TCO
& CO. ü
Project Engineer … Cold Storage Combined with Food Processing Plant Projects – 18 month duration (Cost Plus; $11M) for
Farm Fresh Foods ∙
Coordination between trades, resolved problems, and handled RFI’s, NOC’s, CO’s,
RFP’s, extra work orders, daily logs, purchase orders, three-week look ahead
schedule, submittal verification, quality control, inspections, concrete log,
cost codes, site safety, record drawings, MSDS, material ordering,
estimating, & other data to ensure on-time/under budget build-out. Target General of NV, Inc - Projects ü
Senior Project Engineer … Coronado High School Project – 18 month duration (Hard Bid; $39M) for
Clark County School District ∙ RFI’s, NOC’s, RFP’s, EWO’s, PO’s,
OSHA reports, MSDS, three week schedule, daily logs, submittals, quality
control, pre-inspections, cost codes, productivity graphs, percentage
complete, concrete log, site safety, record drawings, punch-list, close-out documents,
& material ordering to ensure a timely build-out. Clark & Sullivan Constructors -
Projects ü
Field Engineer … Secured Juvenile Treatment Facility Project 12 month duration (level 10 security) (Hard
Bid; $16M) for City of North Las Vegas ∙
Layout, verification of elevations (pads, corners, interior/exterior walls,
footings, vertical rebar laps, anchor bolts, doors, windows, stem-walls,
finish floors, fence line, flat work, & underground utilities).
Constructed perimeter edge forms, block-outs, reinforcing vertical template,
& retaining walls. ü
Project Engineer … Desert Pines High School Project – 18 month duration (Hard Bid; $38M) for
Clark County School District ∙ RFI’s, NOC’s,
RFP’s, EWO’s, PO’s, OSHA reports, MSDS, three week schedule, daily logs,
submittals, quality control, pre-inspections, cost codes, productivity
graphs, percentage complete, concrete log, site safety, record drawings,
punch-list, close-out documents, & material ordering to ensure a
timely build-out. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
French |
Beginner |
|
|
Spanish |
Beginner |
|
|
|